
LONGi Hi-MO X10 PANELS
HPBC 2.0 · MODEL STATED IN THE SPECIFICATION
The LONGi Hi-MO X10 family uses HPBC 2.0 technology. Exact power, efficiency and warranty terms are stated for the selected model and supply documents.
TURNKEY INSTALLATION
We size the system for your consumption and objective: reducing grid-energy use or backing up critical loads. The proposal defines the equipment, work scope and a site-specific calculation.
NO OBLIGATION
Provide your name, phone number, site type and primary objective. Add consumption and a comment if known.
OR CALL
+998 97 184 00 99AFTER THE REQUEST
Not just a callback. DETOS prepares an engineering calculation that helps you make a decision for the site.
System sizing for consumption, roof, land, or industrial load.
Panels, inverter, batteries if needed, mounting, and warranty terms.
Estimated solar generation and expected impact on electricity expenses.
Work sequence: survey, design, supply, installation, and connection.
Clear comparison of current consumption and expected savings after installation.
A document with project scope, DETOS responsibility, and next steps.
DOCUMENT SAMPLE
After the survey, you receive a document with equipment specifications, work scope, generation forecast, schedule and contract terms for your site.
REAL PROJECTS
On-grid and hybrid stations for homes and commercial facilities in Tashkent, Bukhara and Namangan. Capacity and system type are selected for the site objective.






REAL PROJECTS. VERIFIABLE SCOPE. ONE CONTRACTOR.
SYSTEM TYPES
Every site is unique. We design the system for your consumption, operating mode, and backup-power requirements.
An on-grid system works with the city grid. The site uses solar energy during the day, and surplus energy can flow to the grid under the current green tariff.
A hybrid system combines solar panels, grid, and batteries. It maintains backup power during outages and helps manage consumption through the day.
An off-grid system works without permanent grid connection. The project is built around load, autonomy days, batteries, and site operating conditions.
ON-GRID. OFF-GRID. HYBRID. WE BUILD ALL THREE.
PROJECT SCOPE
The scope depends on the site and system type. The document separately lists included work, equipment and project exclusions.
Panels, inverter and batteries when required by the system architecture.
Profiles, fasteners and details for the agreed roof type or ground structure.
Cables, MC4 connectors, routes and conductor sizes according to project distances and loads.
Grounding, breakers, fuses and SPDs for the DC and AC sides under the approved scheme.
Critical loads, batteries and ATS are included only when required by the design.
Checks, monitoring setup, the agreed document set and service terms.
Agreed separately: roof strengthening and repair, construction work, unusual cable routes, utility work and maintenance.
EQUIPMENT
Equipment is selected after the site calculation. The offer lists panels, inverter, batteries if needed, mounting, and warranty terms.

HPBC 2.0 · MODEL STATED IN THE SPECIFICATION
The LONGi Hi-MO X10 family uses HPBC 2.0 technology. Exact power, efficiency and warranty terms are stated for the selected model and supply documents.

ON-GRID AND HYBRID SOLUTIONS
Inverter type, phase, input ranges and power are checked against the array, grid and backup loads. Monitoring depends on the selected model and configuration.

LiFePO4 · CAPACITY SIZED FOR BACKUP
Capacity and permitted discharge power are sized from critical loads and required backup time. BMS, voltage and inverter compatibility are checked against model documents.

ROOFTOP OR GROUND INSTALLATION
Material, geometry and fasteners are defined after survey and calculation. Roof capacity, wind effects and engineered details must be checked for the specific site.
PROCESS
You leave your phone number and site type. An engineer contacts you to confirm consumption and objectives.
We inspect the roof or land, orientation, shading and electrical infrastructure. Visit terms are agreed in advance.
Capacity and equipment selection, generation forecast, economic assessment and schedule—all in the commercial proposal.
Detailed design with generation modelling. We support the permits and approvals required for grid connection.
Installation follows the agreed design. The schedule reflects scale, site readiness and equipment delivery.
We commission the system and hand over the agreed documents. Monitoring, warranty and service terms are stated by configuration and contract.
QUESTIONS AND CONCERNS
Answered by DETOS engineers. The exact estimate is site-specific: consumption, roof or land, system type, batteries and connection.
Get a calculation for your site: system capacity, equipment, installation timeline, and savings forecast.