DESIGN & INSTALLATION
HVAC ENGINEERING
IN UZBEKISTAN
Design, supply, installation and commissioning of air conditioning, ventilation and heating systems. A DETOS engineer visits the site, surveys it and prepares a project for your requirements.
WHAT WE INSTALL
FULL-CYCLE HVAC WORKS
We design, supply and install air conditioning, ventilation and heating systems for commercial and industrial facilities. Every site is different — we select equipment for the heat load, layout and operating mode.
VRF / VRV SYSTEMS
Multi-zone air conditioning systems with variable refrigerant flow. One outdoor unit serves up to 64 indoor units. Optimal for business centers, hotels and administrative buildings.
- Installed systems: 120 and 400 kW
- Simultaneous cooling and heating
- Room-by-room climate control
CHILLERS & FAN COILS
Central cooling systems based on air- or water-cooled chillers. A solution for large facilities — from business centers to industrial plants.
- Installed system: 30 kW
- Air and water cooling
- Scales as the facility grows
HEAT PUMPS
Air-to-water and ground-to-water systems. Efficient heating and cooling from one source. COP up to 4.5 — 1 kW of electricity delivers up to 4.5 kW of heat or cooling. Pairs ideally with solar power stations.
- Heating and cooling from one system
- Up to 75% savings compared with boilers
- Full integration with a solar power station
VENTILATION
Supply and exhaust units with heat recovery. Industrial ventilation, smoke extraction and air curtains. Designed around sanitary standards and site specifics.
- Up to 85% heat recovery
- Design to SNiP and fire safety standards
- CO₂ and humidity automation
INDUSTRIAL COOLING
LCAC, precision air conditioners and ducted split systems. Solutions for workshops, warehouses, server rooms and retail halls. Heat-load calculation for specific equipment and processes.
- Workshops, warehouses, server rooms
- 24/7 operating modes
- Accuracy down to ±0.5°C
VRF. CHILLERS. HEAT PUMPS. VENTILATION. WE WORK WITH EVERY SYSTEM TYPE.
COMPLETED PROJECTS
REAL SITES IN TASHKENT
Not catalog photos. Real sites we designed and commissioned.
PROCESS
SITE WORKFLOW
SITE SURVEY
An engineer visits the site: measurements, layout analysis, heat load and power supply. Free of charge.
DESIGN
Heat-load calculation, equipment selection, pipe routing and automation diagrams. Coordinated with the architect and client.
SUPPLY & INSTALLATION
Equipment supplied from global manufacturers. Installation by a certified team according to the approved design.
COMMISSIONING
Balancing, automation setup and load testing. We do not leave until every zone reaches the design parameters.
HANDOVER
As-built documentation, operating instructions and maintenance regulations. You accept a working system.
MAINTENANCE SERVICE
Seasonal maintenance, diagnostics, repairs and refrigerant charging. The system works for years without surprises.
NO OBLIGATION
GET A PROPOSAL FOR YOUR SITE
Leave your number and briefly describe the site. We will clarify the parameters, survey the site and prepare a project for your needs.
+998 97 184 00 99AFTER THE REQUEST
WHAT YOU RECEIVE
Not a template answer. Engineering calculation for your site with specific solutions.
SYSTEM RECOMMENDATION
Which system type is optimal for your site: VRF, chiller, heat pump or a combination.
HEAT-LOAD CALCULATION
Room-by-room load calculation, capacity selection and energy consumption estimate.
EQUIPMENT SPECIFICATION
Models, manufacturers, technical specifications and warranty terms.
IMPLEMENTATION TIMELINE
Design, supply and installation — a clear stage-by-stage schedule.
SAVINGS ESTIMATE
Comparison of costs before and after, payback and operating expense estimate.
COMMERCIAL OFFER
A document with project scope, DETOS responsibility, and next steps.
FAQ
HVAC — IN BRIEF
What is a VRF system and when is it needed?
How is a chiller different from VRF?
How much does an HVAC project cost?
What equipment do you supply?
Can you integrate HVAC with a solar power station?
What experience do you have in HVAC?
READY TO DISCUSSYOUR SITE?
Get a calculation for your site: system type, capacity, equipment, timeline and cost.